🧱 Concrete slab
Cubic yards, 80-lb bag counts, and ready-mix cost for patios, shed pads, driveways, and sidewalks — plus a thickness guide and a ready-mix vs. bags breakdown.
Open calculator →Free, no-signup calculators for the jobs homeowners price most — yard, garden, room, and roof. Each calculator has its own page with the math shown, an in-depth guide, and prices you can edit to match your local store.
10 × 10 ft concrete slab, 4″ thick
1.36 cubic yards (with 10% extra) · 62 × 80-lb bags if you DIY · about $224 in ready-mix before delivery. Try it on the concrete calculator page — change the size to yours.
Pick your project. Each page has the calculator first, then a full guide: choosing materials, ordering, doing the work, and the mistakes that cost people money.
Cubic yards, 80-lb bag counts, and ready-mix cost for patios, shed pads, driveways, and sidewalks — plus a thickness guide and a ready-mix vs. bags breakdown.
Open calculator →Cubic yards or bag counts for garden beds, with a mulch-type comparison, depth guide, and the bags-vs-bulk break-even point most people get wrong.
Open calculator →Gallons for any room size and coat count, with primer handled properly, a sheen guide, and a ready-reckoner for common room sizes.
Open calculator →Tons to order for driveways, paths, and drainage, with stone densities, driveway layer construction, and delivery-vs-pickup math.
Open calculator →Cubic yards or bag counts for raised beds, lawn leveling, and garden fill, with a screened-vs-fill buying guide and the settling allowance everyone forgets.
Open calculator →Tons or 50-lb bags for paver bedding, sandboxes, and pool bases, with real densities per sand type and the play-sand-under-pavers warning.
Open calculator →Panels, posts, and concrete bags for a privacy fence run, priced per linear foot so you can check a contractor's quote against the material list.
Open calculator →Board counts with waste, linear footage, and screw counts for new decks and re-decking, with an honest wood-vs-composite cost comparison.
Open calculator →Tile counts by size and pattern waste, plus the thinset and grout that finish the job — and the same-dye-lot rule that saves floors.
Open calculator →Sheets, joint compound, and tape for finishing a room, with sheet-type guidance (including the garage fire code) and the thin-coats finishing method.
Open calculator →True sloped area from footprint and pitch, squares and bundles to order, and how to read a roofer's bid against your own numbers.
Open calculator →Paver counts by size plus the gravel base and bedding sand underneath — the layers that decide whether a patio stays flat.
Open calculator →Typical U.S. material costs for common sizes — use the calculator pages for your exact measurements.
Ready-mix at 4″ thick (1.96 yd with 10% waste). Hired out with forming & finishing: $1,300–$2,200.
1.85 yd at 3″ deep. In bags: ~25 bags, $110–$150. Dyed mulch costs $5–$10/yd more.
2 gallons for 2 coats. Pro job with trim & ceiling: $550–$950 in most metros.
~2.9 tons at 3″ deep, picked up. Delivered & spread by a pro: $400–$700.
2.72 yd at 4″ deep with settling figured in. In 1.5 cu ft bags: 49 bags, about $196.
13 panels, 14 posts, 21 bags of concrete — $10.62/ft. Installed quotes typically run $25–$45/ft.
29 pressure-treated 16-ft boards plus fasteners. Same deck in composite: about $1,480 in boards and clips.
14.8 squares at 6/12 pitch — 45 bundles plus underlayment. Pro re-roof installed: $5,500–$9,000.
| Project | Materials (DIY) | Typical pro total | Worth DIY? |
|---|---|---|---|
| Concrete slab 10×10 | $224–$403 | $850–$1,500 | Small pads yes; driveways — finishing skill matters |
| Mulch beds | $35–$140 | $250–$500 with labor | Almost always — low skill, high labor markup |
| Paint a room | $95–$180 | $350–$850 | Yes for bedrooms; pros win on ceilings & trim |
| Gravel driveway refresh | $130–$250 | $400–$800 | Yes if delivered — spreading is the work |
| Wood fence, 100 ft | $1,062 | $2,500–$4,500 | Yes if you can dig — post-setting is the real skill |
| Re-deck 16×12 ft | $786 | $2,400–$4,000 | Yes — boards on a sound frame is a weekend job |
| Tile a 10×10 bathroom floor | $516 | $1,200–$2,200 | Yes with patience — layout and prep decide the result |
| Re-roof 40×30 ft (materials) | $1,970 + extras | $5,500–$9,000 | Small, low, simple roofs only — see the roofing guide |
Pro totals are national ballparks for 2025–26 and vary widely by region, access, and prep work. Always get 2–3 local quotes for jobs over $1,000.
Ready-mix or 80-lb bags, 2×4 form boards, stakes, gravel base, rebar or wire mesh, float & trowel, concrete sealer.
Bulk or bagged mulch, landscape fabric (optional), edging, wheelbarrow, garden rake, work gloves.
Interior paint, primer if needed, 9″ roller + covers, angled brush, painter's tape, drop cloth, tray & liners.
Stone by the ton, landscape fabric for driveways, metal edging, plate compactor rental for bases, rake & shovel.
Pre-built panels or pickets + rails, 4×4 posts, 60-lb concrete bags, gate kit & hardware, post-hole digger, string line.
Deck boards, joists & hangers if framing, screws or hidden clips, post bases, concrete for footings, stain or sealer for wood.
Tile, thinset, grout, backer board, spacers; drywall sheets, screws, compound, tape, corner bead, primer.
Shingles, underlayment, ridge cap, drip edge, nails; pavers, base gravel, bedding sand, polymeric joint sand, edge restraint.
Take your calculator result to any home center or landscape supplier — the quantities on each calculator page are exactly what to ask for at the counter.
Uneven ground, spillage, and settling eat material on every project. Running short mid-pour or mid-bed costs a second delivery fee — extra material is the cheapest insurance.
Defaults reflect 2025–26 U.S. national averages for materials. Every price field is editable — type in your local store or supplier quote for an exact estimate.
Under about half a cubic yard, bags are simpler and often cheaper all-in. Over 1 yard, bulk / ready-mix wins on price and labor almost every time.
Tool rental, permits, excavation, forms, edging, and disposal. Delivery is included only if you enter your supplier's fee in the delivery field on a calculator — for concrete and gravel especially, delivery ($60–$150) is the most common surprise cost.
For patios, shed pads, driveways, and sidewalks. Punch in your slab, get cubic yards, the bag count if you're mixing it yourself, and what ready-mix should run you — delivery fee included if you add it.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
Assumes a flat, rectangular slab on a prepared base.
Run the math on a typical backyard patio, 12 × 12 ft at 4 inches thick. That's 48 cubic feet of concrete, which is 1.78 cubic yards on paper. Add the standard 10% for a base that dips and rises a little, and you're at 1.96 yards. Here's the part nobody tells you until you call the plant: ready-mix is sold in quarter-yard steps, so you won't order 1.96 of anything. You'll order 2 yards, and that's fine — the leftover is a lot cheaper than a second truck.
Why does the "exact" number always come up short in real life? Because your forms say 4 inches, but the ground underneath doesn't. If the base averages just half an inch deeper across the slab — easy, if it wasn't screeded carefully — your 1.78-yard patio quietly becomes a 2-yard pour. The 10% waste figure in the calculator isn't padding. It's the difference between finishing the slab and standing in wet concrete doing desperate math.
Thicker is stronger, but concrete is sold by volume, so every extra inch costs real money. Match the thickness to what the slab actually carries:
| Job | Thickness | Notes |
|---|---|---|
| Sidewalk, garden path | 3.5–4″ | Foot traffic only. 4″ is easier to form with standard 2×4 lumber. |
| Patio, shed pad | 4″ | The default for a reason. Handles furniture, mowers, and a loaded shed. |
| Driveway, parking pad | 5″ | Cars and pickups, day in and day out. Wire mesh or rebar earns its keep here. |
| RV pad, heavy trucks, shop floor | 6″ | Rebar on a grid, not mesh — and check local code before you pour. |
An 80-lb bag yields about 0.6 cubic feet. That sounds harmless until you convert a real job: the 10 × 10 slab at the top of this page is 62 bags. A 2-yard patio is 90. Each bag has to be hauled, opened, mixed, placed, and finished before the load in the wheelbarrow starts to set up — and the whole slab needs to stay "live" so it finishes as one surface, not a patchwork of cold joints.
Our rule from doing it both ways: under half a yard (a post base, a small step, a mailbox pad), bags are simpler and cheaper all-in. Between half a yard and a yard, it's a judgment call based on how many helpers you have. Over a yard, the truck wins on price, on labor, and on the quality of the finish — even after the delivery fee.
At 4″ thick with 10% extra: 62 bags. That's the job that converts most people to ready-mix — 62 bags is over two tons of dry mix to move by hand.
A surcharge many plants add to small ready-mix orders (often under 4–5 yards) to cover sending out a mostly empty truck. Enter it in the delivery field so your total reflects the real bill.
For a patio, mesh mainly holds cracks tight if they form. For driveways and anything carrying vehicles, rebar or heavy mesh is worth it. It prevents separation, not cracking itself.
Light drizzle after finishing is survivable; a downpour on fresh concrete ruins the surface. Most plants will let you reschedule the morning of — call early rather than gambling a whole slab.
For garden beds and landscaping. Tell it your bed size and depth and it returns cubic yards for bulk, the bag count if you're hauling it yourself, and both prices — with settling figured in, because mulch always settles.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
3 inches is the sweet spot — enough to block weeds, not so much it smothers roots.
Take the bed in the calculator above — 20 ft long, 4 ft wide, mulched 3 inches deep. The raw math says 20 cubic feet, or 0.74 yards. Now the real-world corrections. Fresh mulch is fluffy; within a month it settles by roughly a tenth, which is why this calculator carries a 10% waste/settling figure by default. That takes you to 0.81 yards, or 11 bags if you're buying 2 cu ft bags.
And here's where the bags-vs-bulk decision actually gets made. Eleven bags at $4.50 is about $50 and fits in a car trunk across two trips. The bulk yard will sell you that same mulch for roughly $37 — but the delivery fee, commonly $50–$75, lands on top and eats the savings whole. Under a yard, bags usually win. Over a yard, the math flips hard and keeps flipping: at 3 yards you're comparing ~41 bags and a sore back against one dump in the driveway.
All mulches cover soil. They differ in how long they last, how they behave in rain, and what they do to the bed over a season or two.
| Type | How it behaves | Best for |
|---|---|---|
| Shredded hardwood | Knits together, stays put on slopes, breaks down in about a year and feeds the soil as it goes. | Most beds — the safe default. |
| Dyed mulch (red/brown/black) | Same wood, colored. Holds its color longer than natural mulch holds its tone; costs about $5–$10 more per yard. Color fades if you spread it and it rains before it dries. | Curb-appeal refreshes, listings photos. |
| Bark nuggets | Chunky and long-lasting, but individual pieces float and migrate in heavy rain. | Flat beds away from downspouts. |
| Cedar | Slow to break down, pleasant smell, naturally slower to attract insects. Pricier per yard. | Beds against the house, play areas. |
| Pine straw | Light, fast to spread, sold by the bale. Settles into a mat; slightly acidifies soil as it decays. | Azaleas, camellias, large Southern beds. |
Two inches is a top-up over last year's mulch. Three inches is the working depth for a new bed — it shades out most weed seeds and holds moisture without suffocating roots. Four inches is for a bed you're reclaiming from weeds, and even then, keep it pulled back from stems and trunks.
More is not better. The "mulch volcano" — a cone of mulch piled against a tree trunk — traps moisture against bark, invites rot and pests, and encourages roots to grow up into the mulch instead of down into the soil. Spread mulch like a donut around trees, not a volcano: flat, even, and a few inches clear of the trunk.
13.5 bags at 2 cu ft each. If your store's bags are 1.5 cu ft, it's 18 — which is why checking the bag label changes the whole bags-vs-bulk decision.
Once you need more than about 1 yard and the delivery fee gets spread across enough material. At 2–3 yards, bulk usually wins by a wide margin even with delivery.
Top up yearly to hold 3″. Organic mulch is supposed to break down — that decay is what feeds the soil. If it never disappears, it isn't doing that job.
Mulch doesn't feed termites the way wood in your house does, but a deep layer against the foundation holds moisture they like. Keep mulch a few inches from siding and don't bury the foundation line.
Walls only. Enter the room, the coats, and the doors and windows to subtract, and get the gallons to buy — with primer priced separately, because primer is its own line item and pretending otherwise is how budgets drift.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
One gallon covers about 350 sq ft per coat on smooth, primed drywall — less on textured or unprimed walls. The guide below explains when to plan on less.
Four walls, 12 ft each, 8 ft ceilings: 384 square feet of wall. Subtract one door (21 sq ft) and two windows (30) and you're painting 333 sq ft. Two coats means laying down 666 sq ft of coverage. At the standard 350 sq ft per gallon, that's 1.9 gallons — so you buy 2 gallons, and the last inch in the second can becomes your touch-up paint. Keep it. You'll want it.
Now change one variable: the walls are a heavy orange-peel texture, or they're unprimed. Real coverage drops toward 250–300 sq ft per gallon, and that same room needs 2.2–2.7 gallons for two coats. This is the single most common reason a "2-gallon job" runs dry on the last wall. If your walls are textured, previously unpainted, or you're making a big color jump, plan the third gallon into the budget and keep the receipt — unopened paint goes back.
Two coats, 8 ft ceilings, one door and two windows subtracted, smooth primed walls:
| Room | Paintable area | Paint to buy |
|---|---|---|
| 10 × 10 ft | 269 sq ft | 2 gal |
| 12 × 12 ft | 333 sq ft | 2 gal |
| 12 × 16 ft | 397 sq ft | 3 gal |
| 16 × 20 ft | 525 sq ft | 3 gal |
Notice the 12 × 16: it needs 2.3 gallons of actual coverage, but you buy 3. That "wasted" 0.7 gallon is the price of paint being sold in whole gallons — and again, it's your touch-up reserve, not waste.
| Sheen | Character | Use it in |
|---|---|---|
| Flat / matte | Hides wall flaws best; scuffs easily and doesn't love scrubbing. | Ceilings, low-traffic bedrooms, imperfect walls. |
| Eggshell | A hint of shine, noticeably tougher than flat. | Living rooms, hallways, most bedrooms — the default. |
| Satin | Wipes clean, shows roller marks and flaws more. | Kitchens, baths, kids' rooms, doors you touch daily. |
| Semi-gloss | Hard, washable, highlights every dent under it. | Trim, cabinets, bathroom walls. |
| Gloss | Maximum shine and maximum honesty about surface prep. | Furniture and accents, rarely whole walls. |
Primer is not watered-down paint and it's not always optional. You genuinely need it on new drywall (bare drywall and joint compound soak up finish paint unevenly — the seams will flash through), over stains (water marks, smoke, marker — use a stain-blocking primer or you'll paint the stain four times and still see it), and on big color jumps, where a tinted primer can save you an entire finish coat.
"Paint and primer in one" is fine over previously painted walls in decent shape. It is not a substitute for real primer on bare drywall, whatever the can implies. Primer is priced as its own field in the calculator — it defaults to $32 a gallon as a November 2026 U.S. average, and you should change it to whatever your store charges, because it varies.
Same color, same sheen, walls in good shape — yes, often. Any real color change, or painting over a darker color, plan on two. The calculator's coat selector exists because "one coat coverage" claims assume conditions most rooms don't have.
The rounded-up partial gallon from your purchase is usually plenty for touch-ups. Store it sealed, indoors, and labeled with the room and the date.
No — this one is walls only. Ceilings are simple: length × width ÷ 350 per coat, almost always flat white, almost always 1 gallon for a standard bedroom ceiling.
Deep colors have less pigment coverage per coat, especially reds and deep blues. A gray-tinted primer underneath often gets you back to two coats — cheaper than a third gallon of finish paint.
For driveways, paths, and drainage. Gravel is figured by volume but sold by weight, so this converts your area and depth into the tons to actually order — and what they'll cost, delivery included if you add it.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
Weight depends on stone type, so pick yours — a yard of pea gravel and a yard of crushed stone don't weigh the same.
The calculator above is set to a common job: a 20 × 10 ft driveway area, topped up 3 inches deep with crushed stone. The volume is 1.85 cubic yards before settling — 2.04 yards once the 10% settling allowance goes in. Crushed stone runs about 1.40 tons to the yard, so you're ordering 2.85 tons. In practice you'll tell the yard "3 tons," because stone is sold by the weighed ton and nobody delivers 0.85 of anything. At the $45/ton average, that's about $128 of stone.
Now the decision that actually matters: how does it get to your house? A half-ton pickup can legally and safely carry roughly half a ton of stone per trip once you're honest about payload — so 3 tons is about six trips, six loadings, six unloadings by shovel. A supplier will dump the same 3 tons in your driveway in one visit for a $60–$100 delivery fee. There are jobs where hauling it yourself makes sense. A multi-ton driveway refresh is rarely one of them.
| Stone | Weight | Behavior | Best for |
|---|---|---|---|
| Crushed stone (angular) | ~1.40 tons/yd | Sharp edges lock together under weight. Stays where you put it. | Driveway top layers, drainage, under slabs. |
| Pea gravel | ~1.30 tons/yd | Round and smooth — shifts underfoot and migrates out of beds. Feels good barefoot, which is its whole appeal. | Paths, play areas, dog runs. Not driveways. |
| River rock | ~1.35 tons/yd | Decorative, larger, doesn't compact. Weeds grow between stones if there's no fabric under it. | Dry creek beds, accents, drainage swales. |
| Decomposed granite | ~1.45 tons/yd | Packs down firm, almost like a soft pavement, especially with a stabilizer. Can track into the house on shoes. | Paths, patios, xeriscaping in dry climates. |
| Crusher run (base stone) | ~1.45 tons/yd | Stone plus fines — compacts into a hard, stable base. Not pretty, not meant to be seen. | The layer under everything else. |
The pattern in that table: angular stone locks, round stone rolls. Nearly every gravel disappointment comes from ignoring it — pea gravel on a driveway ends up in the lawn, and smooth river rock in a walking path feels like ball bearings.
A gravel driveway is layers, not a pile. Skip the structure and the stone churns into the mud within a season, no matter how many tons you add on top.
About 6–8 inches built in layers: ~4″ of compacted base plus 2–3″ of top stone. A single 6″ layer of top stone with no base feels fine for a month and then starts churning into the soil.
It's migrating down, not vanishing. Without fabric and a compacted base, stone presses into soft soil with every pass of a tire. The fix is structure underneath, not more stone on top.
For a top-up, yes — that's exactly the 2–3″ refresh this calculator defaults to. Rake the existing surface first so the new layer keys in instead of sliding.
Check the payload sticker on the door jamb, not the truck's name. A "half-ton" truck often has 1,200–1,500 lb of payload including you and fuel — call it half a ton of stone per trip to stay safe and legal.
For raised beds, lawn leveling, and garden fill. Enter your area and depth and get cubic yards for a bulk load, the bag count if you're hauling it yourself, and both prices — with a settling allowance built in, because loose topsoil always compacts down.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
Measure the area you're covering and how deep the soil needs to be once it's settled — not how fluffy it looks in the pile.
The calculator above is set to a common job: a 20 × 10 ft area that needs 4 inches of topsoil to level it and give plants real rooting depth. The raw math is 66.7 cubic feet — 2.47 cubic yards. Add the 10% settling allowance and you're ordering 2.72 yards, which the yard will round to 2.75 or 3. At the $45 average that's about $122 of soil.
The bag route tells you why bulk exists: that same job is 49 bags at 1.5 cu ft each, roughly $196, and 49 bags of soil weigh in the neighborhood of a ton. Bags make sense for a single raised bed or a few low spots by the sidewalk. Past a yard or so, they're the expensive way to move dirt.
| Job | Depth | Notes |
|---|---|---|
| Lawn topdressing | ¼–1″ | Thin and raked in. More than an inch at once smothers the grass you're trying to help. |
| Garden bed refresh | 2–3″ | Over existing soil. Blend the top inch with a fork so you don't create a layer line roots hate crossing. |
| Leveling low spots | 3–4″ | Fill, water it in, then check again in a week — settling shows you the spots you missed. |
| New raised bed | 8–12″ | Pure topsoil compacts into a brick over a season. Mix in compost — a 50/50 or 60/40 soil-to-compost blend drains and feeds far better. |
These are different products at different prices, and the cheap one is cheap for a reason. Screened topsoil has been run through a mesh to remove rocks, roots, and clods — it's what you want anywhere plants or a lawn are involved. Unscreened topsoil is the same soil with the debris left in; fine for rough grading if you're willing to rake out rocks. Fill dirt is subsoil with almost no organic matter — good for filling a hole, terrible for growing anything. If a price looks too good for topsoil, you're probably being quoted fill dirt.
One more check before the truck comes: ask where the soil came from. Soil stripped from a construction site can carry weed seed, and occasionally worse. Reputable yards can tell you the source and will let you look at the pile — good topsoil is dark, crumbly, and smells like earth, not chemicals.
Roughly 2,000–2,400 lb depending on moisture — about a ton. That's the number that matters for your truck or trailer: most half-ton pickups should carry half a yard per trip, not a full one.
At 3″ deep, one yard covers about 108 sq ft. At 4″, about 81 sq ft. At a 1″ topdressing, over 300 sq ft — which is why lawn topdressing is a bags-or-one-yard job.
No. Bagged "garden soil" is usually a soil-and-compost blend priced per bag for beds. Bulk topsoil is the base ingredient. For a big bed, bulk topsoil plus bulk compost, mixed on site, is the same recipe at a fraction of the bagged price.
A thin topdressing (under an inch) with overseeding works well. Several inches over living grass just buries the problem — the old grass rots into a spongy layer. Strip or kill first for deep fills.
For paver bedding, sandboxes, pool bases, and masonry work. Sand is figured by volume but sold by the ton in bulk and by the bag at the store — this converts your area and depth into both, with real densities for each sand type.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
Pick the sand you'll actually use — densities are close, but a ton of one is not a ton of another once it's spread.
The calculator above is set to a 10 × 10 ft area covered 2 inches deep — a pool base, a sandbox refresh, or the bedding under a small patio. The volume is 16.7 cubic feet, or 0.62 cubic yards; with the 10% settling allowance, 0.68 yards. Concrete sand at 1.40 tons per yard makes that 0.95 tons — call it a ton at the yard, about $38 at the $40 average.
Now price it in bags: a 50-lb bag holds roughly half a cubic foot, so the job takes 37 bags and about $185. Same sand, same job, nearly five times the money — plus 1,850 lb of bags to load, unload, and open. This is the clearest bags-vs-bulk example on the whole site: under a quarter-ton, bags are fine. Anywhere near a ton, get it dumped.
| Type | Texture | Use it for | Don't use it for |
|---|---|---|---|
| Concrete sand | Coarse, angular, washed | Paver bedding (the standard), concrete mixes, pool bases | Sandboxes — too sharp and gritty for kids |
| Play sand | Fine, rounded, washed & screened | Sandboxes, play areas | Paver bedding — rounds grains don't lock, pavers shift |
| Masonry sand | Fine and consistent | Mortar, stucco, top-dressing joints in a pinch | Bedding layers — too fine, holds water |
| Polymeric sand | Fine sand + polymer binder, sold in bags | Sweeping into paver joints — hardens when misted | Bedding — wrong product entirely, and pricey |
The one substitution that causes real failures: play sand under pavers. It feels like a bargain and spreads beautifully, then the patio starts to wander because round grains roll instead of locking. Bedding sand must be coarse and angular — that's concrete sand, sometimes sold as bedding sand or torpedo sand depending on your region.
The bedding layer goes over your compacted gravel base at a consistent 1 inch — no more. Screed it with two pipes and a straight board, don't compact it, and don't walk on it after screeding. A thicker bedding layer is not a leveling fix; it's how patios develop dips. Leveling belongs in the base layer, which is exactly what the paver calculator figures alongside the pavers themselves.
Forty bags make a ton by weight — but check the volume too: 40 bags is only about 20 cu ft, while a bulk ton of concrete sand is closer to 19–21 cu ft. Weight and volume roughly agree here, which is not true of every material on this site.
An 8 × 8 ft box filled 6″ deep (kids need digging depth, and half of it ends up outside) is about 1.2 tons. The calculator with depth set to 6″ via two passes — or just enter your box size at 3″ twice — gets you there; most parents order 1.5 tons and are glad.
Yes — it's a common golf-course practice, usually a sand/topsoil mix at ¼–½″. Pure sand in quantity can create a layer grass roots dislike, so for anything beyond a light topdressing, blend it or use the topsoil calculator instead.
Because loaders measure volume and scales measure weight, and yards sell by the scale. The density figures in this calculator (1.35–1.40 tons/yd) are the bridge — if your yard's sand runs heavier or lighter, they'll tell you their number; use it.
For a privacy fence built from pre-built panels. Enter the run length and it counts panels, posts, and the concrete bags to set them — then prices the whole material list, gates included, so you can compare it against a contractor's per-foot quote.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
One straight run. For a full yard, measure each side and run the calculator per side — corners need their own posts, and the per-side count stays honest.
The calculator above prices the most common backyard job there is: a 100-ft straight run of 6-ft privacy fence built from 8-ft pre-built panels. Panels: 100 ÷ 8 = 12.5, rounded up to 13 — the last one gets ripped down to the 4 ft you actually need, and the offcut becomes gate stock or a patch piece. Posts: one more than panels, 14. Concrete at 1.5 bags a post: 21 bags.
The money: 13 panels at $58 is $754, 14 posts at $13 is $182, concrete is $126 — $1,052 in materials, $10.52 per linear foot. Hold that per-foot number in your head when the quotes come in. If a contractor bids $32/ft installed, you now know roughly $21/ft of it is labor, equipment, tear-out, and profit — which may be entirely fair, but at least you're negotiating with the breakdown in front of you instead of a single mysterious number.
| Style | Materials / ft | Notes |
|---|---|---|
| Pre-built panels (this calculator) | $9–$13 | Fastest build. Panel quality varies — sight down each one at the store and reject the warped ones. |
| Board-by-board pickets | $8–$12 | Cheaper materials, much more labor. Stronger fence — rails and pickets are individual, replaceable parts. |
| Chain-link | $6–$10 | Least privacy, longest life per dollar. Different math — fabric is sold by the roll. |
| Vinyl privacy | $18–$28 | Two to three times wood in materials, near-zero maintenance. Posts still need concrete. |
Find your property line. A fence built a foot onto a neighbor's lot is a fence you may get to move at your expense. If the line isn't marked and certain, a survey (a few hundred dollars) is cheaper than rebuilding 100 ft of fence. Call 811 (the national dig-safe line) at least a few business days before you dig — post holes go 24–30″ deep, which is exactly where buried lines live. It's free, and hitting a line without a locate is on you; with one, it usually isn't.
For a 4×4 in a 10–12″ diameter hole, 24–30″ deep: about 1.5 × 60-lb bags once you subtract the post itself. Deep or wide holes in soft soil push it to 2 bags — the calculator's figure is a planning average, so add a couple of spare bags to the order.
Panels for speed: two people can hang a lot of fence in a day. Pickets for quality and repairability: one damaged board swaps out in minutes, and the fence follows sloped ground instead of stepping. On a flat lot with a deadline, panels. On a slope, pickets.
Run each side of the yard as its own calculation. A corner post gets counted once in each run's "panels + 1," so a four-sided yard over-counts by about 4 posts total — acceptable for ordering, since spare posts are the cheapest insurance on the list.
Pressure-treated pine: 15–20 years for posts, 10–15 for panels before boards start failing. Cedar runs longer and costs more. The killer is ground contact and trapped water, not sun — which is why post-setting details matter more than stain.
For new decks and re-decking old ones. Enter the deck size and board length and get the board count with waste figured in, the linear footage, and the fasteners to hold it down — the two numbers people most often run short on mid-job.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
Boards are figured as standard 5.5″-wide deck boards laid with a ¼″ gap — effective coverage 5.75″ per board. Boards run along the deck's length.
The calculator above is set to a 16 × 12 ft deck — 192 sq ft — decked with 16-ft boards running the long way, so no butt joints. Width first: 12 ft is 144 inches, and each board covers 5.75″ with its gap, so you need 144 ÷ 5.75 = 25.04 — 26 rows. Each row is one full 16-ft board. Add 10% for cuts, defects, and the board you'll inevitably sight down and reject, and you buy 29 boards.
Fasteners are where estimates quietly fall apart. Joists at 16″ on center across a 16-ft deck means each board crosses 13 joists; two screws per crossing is 26 screws a board, and 26 boards is 676 screws — two 350-count boxes. At $24 a board and $45 a box, the decking package is $786. Run the same deck in composite at $48 a board and the boards alone jump to about $1,390 — which is the real composite conversation: the material premium is roughly the cost of re-staining wood several times over, paid up front.
| Material | 16-ft board | Lifespan | The trade |
|---|---|---|---|
| Pressure-treated pine | $20–$28 | 15–25 yrs | Cheapest by far. Needs stain/sealer every 1–2 years, can warp and check as it dries. |
| Cedar | $35–$50 | 20–25 yrs | Naturally rot-resistant, lighter, prettier. Softer — dents and scratches show. |
| Composite (capped) | $45–$75 | 25–30 yrs | No staining, no splinters. Gets hot in full sun, needs 12″ joist spacing on diagonals, costs 2–3× up front. |
| PVC | $55–$85 | 30+ yrs | Lightest and most water-proof. Premium price, can feel less solid underfoot on 16″ spacing. |
Wood boards are fine on joists 16″ on center. Most composite manufacturers also allow 16″ for straight runs but drop to 12″ on center for diagonal layouts — and void the warranty if you don't. If you're re-decking an old frame with composite, measure the joist spacing before you fall in love with a 45° pattern. Adding joists to an existing frame is doable; discovering the requirement with the boards already delivered is a bad day.
With 12-ft boards: 144″ ÷ 5.75″ = 26 rows, one board per row, plus 10% → 29 boards. Same count as the 16 × 12 example above, interestingly — width drives the count, length drives the board size.
Hidden clips look cleaner and let boards move, but cost more and make replacing one board a project. Face screws are cheaper, stronger in uplift, and a single board swaps in minutes. For a first deck, screws are the forgiving choice.
If the joists are sound — probe them with a screwdriver; punky wood that crumbles needs replacing. Check spacing for your new board's requirements and confirm the frame is level, because new boards telegraph every dip in an old frame.
Because this calculator prices the decking only. A full deck adds posts, beams, joists, hangers, footings, and railing — often doubling the material bill. Compare any contractor quote line by line against that split.
For bathroom, kitchen, and entry floors. Enter the room and your tile size and get the tile count with waste figured in, plus the thinset and grout that actually complete the job — the supplies that turn a "tile run" into three trips.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
Rectangular room, straight lay. Diagonal and patterned layouts need more waste — the guide below has the figures.
The calculator above is set to the most-requested bathroom job going: 100 sq ft of floor in large-format 12 × 24 porcelain. Each tile covers 2 sq ft, so the floor itself is 50 tiles. Add 10% for the cuts around the tub, toilet flange, and door casing, plus the tile you will drop or miscut — because everyone does — and you buy 55 tiles, 110 sq ft of tile, at $4/sq ft that's $440.
Then the part the tile aisle doesn't volunteer: thinset at roughly 50 sq ft per bag is 3 bags ($54), and grout is 1 bag ($22) with some left over. Total materials: $516 before backer board and tools. Keep the leftover grout and a spare tile or two — a cracked tile five years from now is a ten-minute fix if the matching materials are in a closet, and a floor-matching research project if they're not.
| Layout | Waste to figure | Why |
|---|---|---|
| Straight grid | 10% | Edge cuts and breakage only. |
| Running bond (offset) | 10–12% | Half-tile cuts at both ends of alternating rows. |
| Diagonal (45°) | 15% | Every perimeter tile is a diagonal cut, and offcuts rarely reuse. |
| Herringbone / chevron | 20% | Angle cuts everywhere. Order the extra box; dye lots change between runs. |
That last point deserves emphasis: buy all your tile from the same dye lot, and buy it at once. The same tile reordered a month later can shift shade just enough to glow in a finished floor. Check the lot number printed on every box before you leave the store.
Tile is rigid; houses are not. Tile set directly on a springy wood subfloor cracks along the deflection lines, and grout crumbles out of the joints — the classic failure everyone blames on the grout. The fix is stiffness underneath: sound plywood, cement backer board (or an uncoupling membrane), seams taped and mudded. In a bathroom, add waterproofing on top of that — tile and grout are water-resistant, not waterproof, and the floor under a "waterproof-looking" tile job can rot quietly for years.
Usually by the box, priced per square foot, with the box covering a stated area (often 10–16 sq ft). Divide the calculator's "tile to order" figure by the box coverage and round up to whole boxes.
Porcelain: denser, harder, less water absorption — the safer floor choice, especially in bathrooms. Ceramic is fine for walls and light-duty floors and is easier to cut. Check the box for a floor rating either way.
Cement grout, yes — a penetrating sealer keeps it from staining and makes cleaning easier. Epoxy grout doesn't need it and shrugs off stains, at roughly triple the material price and a much fussier install.
Sometimes — if the existing floor is rock-solid, well-bonded, and you prep and use the right primer/mortar. It also raises the floor height, which cascades into doors and transitions. When in doubt, tear out; the calculator's numbers assume you're starting from the substrate either way.
For finishing a room, a basement, or a garage. Enter the room and get the sheet count, the joint compound, and the tape — the full hanging list, priced, so the store trip happens once.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
Four walls, plus the ceiling if you include it. Doors and windows are not subtracted — in practice the cut-offs become patches and waste, and sheet counts come out about right.
The calculator above prices the standard basement-or-garage room: 12 × 12 ft, 8-ft ceilings, walls and ceiling both rocked. Walls are 384 sq ft; the ceiling adds 144; total 528 sq ft. In 4×8 sheets that's 16.5 — you buy 17 sheets, and the half-sheet difference is not waste, it's the cuts around the door and the sheet you'll score wrong on day one.
Finishing supplies: compound at a bucket per 100 sq ft across all coats is 6 buckets ($108), tape is 3 rolls ($18), sheets at $14 are $238 — $364 in materials. The same room hung and finished by a pro typically runs $2.00–$3.50 per sq ft of board all-in, or roughly $1,050–$1,850. That gap is why drywall is the most-DIYed trade on this page — and the finishing coats, not the hanging, are where the skill (and the sanding dust) actually live.
| Sheet | Use it for | Notes |
|---|---|---|
| ½″ standard | Most walls | The default. Light enough to handle, rigid enough on 16″ stud spacing. |
| ⅝″ fire-rated (Type X) | Garages, ceilings, furnace rooms | Required by code on garage/house walls and most ceilings under living space. Heavier — plan help. |
| ½″ moisture-resistant | Bathrooms, laundry, basements | For humidity, not direct water. Behind a shower you need tile backer, not any kind of drywall. |
| ¼″ flexible | Curves, resurfacing over old walls | Too flimsy as a standalone wall; it's a skin, not a structure. |
| 4 × 12 sheets | Long walls, ceilings with a lift | Fewer seams to finish — the pro's choice. Brutal to move through a finished house; measure your corners and stairwell first. |
About a pound of 1¼″ coarse-thread screws per 5 sheets — call it 4 lb for the example room. Buy the 5-lb box; leftover screws are a shop staple, and running out mid-ceiling is miserable.
This calculator doesn't, deliberately. A standard door opening is about half a sheet, and the cut-offs get consumed by headers, patches, and mistakes. On a room full of windows the true count drops a sheet or two — order the calculator's number and return the unopened extra.
Paper in corners, always — mesh can't hold a crisp inside corner and cracks there. On flat seams, mesh is faster for beginners but paper bedded properly is stronger. Pros use paper everywhere and a setting compound for the tape coat.
Level 4 (tape + two coats, sanded) is the standard for flat and eggshell paint. Going under glossy paint or strong side-light? Level 5 — a full skim coat — is what makes those walls look right, and it's mostly more compound and more patience.
For re-roofing with architectural shingles. Enter the roof's footprint and pitch and get the true sloped area, the squares and bundles to order, and the underlayment — the numbers you need to check a roofer's bid line by line, or to price materials for a small roof you'll do yourself.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
Measure the footprint of the roof (including eaves overhang) from the ground — no ladder required for the estimate. Pitch converts flat footprint into true sloped area.
The calculator above is set to a typical single-story ranch roof: 40 × 30 ft of footprint at a 6/12 pitch. The footprint is 1,200 sq ft, but shingles cover the slope, not the map view — the 6/12 multiplier (1.118) makes the true area 1,342 sq ft. Add 10% waste and you're buying for 1,476 sq ft: 14.8 squares. At 3 bundles per square, that's 45 bundles, plus 4 rolls of synthetic underlayment. At $38 a bundle and $65 a roll: $1,970 in materials.
Now compare a roofer's bid. If a quote for this roof says 17 squares, ask why — either they measured the overhangs more generously, figured 15% waste for your roof's hips, or padded. If it says 13 squares, they're planning to stretch material and you'll see it in the details. The calculator doesn't tell you who's right; it tells you which questions to ask, which is most of what a homeowner can do with a roofing bid.
| Pitch | Multiplier | What it means |
|---|---|---|
| 4/12 | 1.054 | Rises 4″ per foot of run. Walkable, minimum slope for standard shingles with proper underlayment. |
| 6/12 | 1.118 | The most common residential pitch. Walkable with care. |
| 8/12 | 1.202 | Noticeably steep. Most DIYers should stop here — roof jacks and harnesses beyond this. |
| 10/12 | 1.302 | Pro territory for tear-off and install. |
| 12/12 | 1.414 | A 45° roof. Your "1,200 sq ft roof" is really 1,697 sq ft of shingles. |
To find your pitch without climbing: in the attic, hold a level against a rafter, mark 12″ along it, and measure the vertical rise from the level to the rafter at that mark. Or use a pitch-finder app against a gable end from the ground. Guessing the pitch is the biggest single error in roof estimates — the difference between 4/12 and 8/12 on this example roof is nearly 2 squares.
Honestly: a small, simple, low-pitch roof — a shed, a garage, a single-story gable — is within reach of an experienced DIYer with help and fall protection. A steep, cut-up, two-story roof is where professionals earn their money: the work is heavy, hot, dangerous, and unforgiving of slow progress once the old roof is off and weather is coming. Use this calculator either way — to price a small job yourself, or to walk into a contractor's bid knowing your squares cold.
Three for most architectural shingles — but check the bundle: some heavyweight shingles run 4–5 bundles per square, and three-tab shingles are 3. The coverage printed on the wrapper outranks any rule of thumb, including this one.
Many codes allow one overlay, and it saves tear-off cost — but it hides deck damage, adds serious weight, shortens the new roof's life (heat cooks shingles over an old layer), and voids some warranties. Most roofers, and this site, recommend tear-off.
Three-tabs are a few dollars cheaper per bundle and rated ~20 years; architectural (dimensional) shingles run $33–$45 a bundle and 25–30 years, with better wind ratings. On a per-year basis the architectural shingle usually wins, which is why three-tabs are disappearing.
A pro crew does the example roof in 1–2 days including tear-off. A DIY crew of two should plan a long weekend for a simple roof — and a weather window with no rain in the forecast for the whole run, plus a tarp plan anyway.
For patios, walkways, and paver driveways. Enter the area and paver size and get the paver count with waste figured in — plus the gravel base and bedding sand underneath, because a paver job is mostly what's under the pavers.
By Edgar, site publisher · Last updated November 28, 2026 · Default prices are editable U.S. national averages as of November 2026, not live store pricing.
Base and sand are figured for a standard patio build: 4″ of compacted gravel base and a 1″ bedding sand layer. Driveways need a 6″ base — the guide explains how to adjust.
The calculator above is set to the classic first patio: 12 × 12 ft — 144 sq ft — in 6 × 9″ concrete pavers at 2.67 pavers per square foot. The raw count is 385 pavers; with 10% for cuts and breakage you buy 423, about $761 at $1.80 each. Underneath them: 1.96 cubic yards of base gravel (call it 2 yards, roughly 2.9 tons) and 0.49 yards of bedding sand (about 0.7 tons), plus 48 ft of edge restraint for the perimeter.
Total the whole system and a "simple" patio is roughly $761 of pavers, ~$130 of base stone, ~$30 of bedding sand, ~$60 of polymeric joint sand, and ~$40 of edging — about $1,020 in materials. A pro installs the same patio for $15–$25 per sq ft ($2,160–$3,600), which tells you where the money in pavers lives: not the pavers, but the excavation, base, and compaction underneath them. That base is also the entire difference between a patio that's flat in ten years and one that's a relief map in two.
| Size | Per sq ft | Character |
|---|---|---|
| 4″ × 8″ (brick format) | 4.5 | The classic. Herringbone in this size is the strongest pattern for driveways — and the most cutting. |
| 6″ × 6″ | 4 | Old-world look, often tumbled. Lots of joints means lots of joint sand. |
| 6″ × 9″ | 2.67 | The modern workhorse — pairs with 6×6s in running patterns, lays fast. |
| 12″ × 12″ | 1 | Clean grid patios. Every paver is visible, so leveling has nowhere to hide. |
| 24″ × 24″ slabs | 0.25 | Contemporary stepping-stone and patio look. Heavy — two-person sets — and unforgiving of a soft base. |
Typically 90–120 sq ft worth, weighing around 3,000 lb. For the example patio you'd order one full pallet plus a partial — another reason delivery beats the pickup truck.
If the slab is sound, level, and drains, yes — with a thinner sand or mortar-set approach and edge restraint to hold the field. If the slab is cracked and heaving, it will telegraph straight through; tear it out or overlay with a proper base.
Regular sand washes out and grows weeds; polymeric sand hardens when misted, locks the field, and resists both — at several times the price per bag. On a patio you plan to keep, polymeric is the standard now. Follow the wetting instructions exactly; over-watering washes the binder out.
Base goes to 6″ minimum (8″ on soft soil), pavers go to 80mm thickness, and herringbone pattern is strongly recommended for interlock under turning tires. Multiply this calculator's base figure by 1.5 for the gravel, and use the gravel calculator to price it by the ton.
By Edgar, site publisher · Last updated November 28, 2026
Home Project Cost Calculators is an independent, free tool site for homeowners and DIYers planning small projects. It exists because of a simple frustration: most project pricing online either hides the math or pushes you to request a contractor quote before showing you a single number. Here, the formulas and the prices are on the page, in the open, and every price field can be changed to match your local store.
Each calculator uses the standard trade formula for its material — volume for concrete and gravel, coverage rates for mulch and paint — and the "How it works" box on each page shows that formula in plain language. Each guide is written from the way these jobs actually go: the quarter-yard rounding at the ready-mix plant, the short-load fee, the bag that's quietly 1.5 cubic feet instead of 2, the textured wall that drinks a third gallon of paint nobody budgeted for.
Default prices are U.S. national averages for 2025–26, based on pricing published by major home centers and landscape suppliers, reviewed and updated periodically — this version is dated November 2026. They are averages, not live store pricing and not quotes. Your local number is the one that matters, which is exactly why every price on every calculator is editable.
The calculators are free, with no account and no signup. To cover hosting and development, this site may display advertising served by Google AdSense and its partners. Advertising never changes a calculator result — the math is the same whether an ad is shown on the page or not. The Privacy Policy explains how advertising cookies work and how to opt out of personalized ads.
Prices drift and formulas get challenged — both are welcome. If a default looks out of date or a result looks off, the Contact page says what to send so it can be checked and fixed.
Last updated November 28, 2026
Found a price that's out of date, a formula that looks wrong, or a project we should add a calculator for? Corrections and suggestions are genuinely useful — they keep the defaults honest.
Email the publisher: ntxautoparts940@gmail.com
Every message is read, though replies may take a few days. One limit worth stating plainly: we can't provide quotes, contractor referrals, or advice about a specific property. For those, your local supplier or a licensed contractor is the right call — bring them your calculator result as a starting point.
Last updated November 28, 2026
This policy explains what information this website does and does not collect, and how advertising cookies are used.
All twelve calculators run entirely in your own browser. The measurements and prices you type in are never sent to us, never stored on a server, and disappear when you close the page. There are no user accounts, no signups, and no forms that collect personal information on this site.
Like most websites, our hosting provider may automatically record standard technical log data when a page is requested — such as IP address, browser type, and the page visited — for security and reliability purposes. We do not use this data to identify individual visitors.
This site may display ads served by Google AdSense. In connection with that advertising:
This site is a general-audience tool for adult homeowners and is not directed to children under 13. We do not knowingly collect information from children.
If this policy changes, the updated version will be posted on this page with a new "last updated" date. Questions about this policy can be sent through the address on the Contact page.
Last updated November 28, 2026
Every result on this site is an estimate based on the measurements and prices you enter and standard material formulas. Results are not quotes, bids, or contracts, and actual quantities and costs will vary with site conditions, material choice, region, and supplier. Verify quantities and prices with your supplier before ordering, and get local quotes for large jobs.
You are responsible for following local building codes, permit requirements, and safe work practices for your project, and for confirming that materials are suitable for your application. Some projects — structural concrete, electrical, and plumbing work, for example — require licensed professionals in many jurisdictions.
We work to keep the formulas and default prices accurate and current — defaults are U.S. national averages dated November 2026 — but we make no warranty that the site or its results are error-free, complete, or available at all times. Use of the site and its estimates is at your own discretion and risk.
Links to third-party websites (such as the advertising opt-out pages in the Privacy Policy) are provided for convenience. We do not control and are not responsible for the content or practices of those sites.